Bingley to Foulridge 12/7/15
Despite an early start on Monday 6th July to get through the Bingley Locks – two sets of staircase locks with 3 in the first and 5 in the second – we were delayed by factors beyond our control – a shortage of Canal and River Trust staff to operate the locks and too many…